Anheuser-Busch: Fort Collins, CO

PROJECT DESCRIPTION
                           

Client: Anheuser-Busch
ProjectBottling, Packaging & Shipping Facility Ventilation Retrofit
Construction ScheduleSix months

PROJECT APPROACH

Design/Build

ROLE

Prime Contractor (direct to owner)
Full-time on-site Project Manager
Managed Subcontractors
Engineer of Record

ENERGY SAVINGS
                           

$300,000 per year
Less than three-year simple payback on project

PROJECT CHALLENGE/SOLUTION

The existing HVAC controls and equipment were not effectively controlled to minimize energy consumption or to maintain a comfortable environment. Wiegmann performed an extensive energy audit and engineered a new control sequence for the HVAC systems, which required the addition of new variable speed supply fans, make-up air units, and re-commissioning and control of existing exhaust fans and louvers.

PROJECT SCOPE

  • Replaced existing HVAC control systems
  • Added new supply fans, make-up air units
  • Re-controled existing equipment
  • Controled new equipment
  • Demolished existing steam unit heaters