PROJECT DESCRIPTION
Client: Anheuser-Busch
Project: Bottling, Packaging & Shipping Facility Ventilation Retrofit
Construction Schedule: Six months
PROJECT DESCRIPTION
Client: Anheuser-Busch
Project: Bottling, Packaging & Shipping Facility Ventilation Retrofit
Construction Schedule: Six months
PROJECT APPROACH
Design/Build
ROLE
Prime Contractor (direct to owner)
Full-time on-site Project Manager
Managed Subcontractors
Engineer of Record
ENERGY SAVINGS
$300,000 per year
Less than three-year simple payback on project
PROJECT CHALLENGE/SOLUTION
The existing HVAC controls and equipment were not effectively controlled to minimize energy consumption or to maintain a comfortable environment. Wiegmann performed an extensive energy audit and engineered a new control sequence for the HVAC systems, which required the addition of new variable speed supply fans, make-up air units, and re-commissioning and control of existing exhaust fans and louvers.