PROJECT DESCRIPTION
Client: CubeSmart Self Storage
Project: HVAC Retrofit
General Contractor: Taylor Kohrs
Floor Area: 95,880 sf
Construction Schedule: October 2016
PROJECT APPROACH
Design/Build
ROLE
Engineer of Record
HVAC Contractor
PROJECT CHALLENGE/SOLUTION
CubeSmart Storage is the fourth largest owner and operator of self-storage facilities in the United States.
The new CubeSmart Storage location in Denver previously housed a lumber supply company. The renovation converts the space into separate heated and air-conditioned personal storage units. A mezzanine level will be added to create a 95,880-square-foot, two-story facility.
Wiegmann Associates has extensive experience in the unique requirements and challenges of conditioned warehouses. The HVAC solution Wiegmann developed will provide cost-effective, reliable and consistent temperature control for the storage facility. A centralized temperature control system will allow the building operator to monitor building temperatures from a single location.