PROJECT DESCRIPTION
Client: St. Louis VA Medical Center-Jefferson Barracks
Project: Energy Efficient HVAC Installation
Construction Schedule: Completed Fall 2020
General Contractor: Walsh/Alberici
Architect: Christner, Inc
ROLE
HVAC Mechanical Contractor
PROJECT APPROACH
Plan/Spec
PROJECT SCOPE
Wiegmann installed the energy-efficient HVAC system to serve St. Louis VA Medical Center-Jefferson Barracks’s new $49 million rehabilitation facility, which serves area veterans and their families. The project included all ductwork, insulation and piping that serves the entire rehab facility, including the chapel, basketball court, pool, offices and rec rooms. To achieve the owner’s goal of energy efficiency, the HVAC system for this new facility utilized the existing campus chilled water and steam loops to feed heat into the building. Wiegmann also installed air handling units, fan coil units, air terminal units, unit heaters, exhaust fans, an energy recovery unit, direct heat recovery chiller, heat exchangers and steam humidification.
The limited space available for equipment posed a project challenge, which Wiegmann was able to overcome through careful planning and coordination with other trades.